Technical Project

We analyse and develop a report of Technical Project. We indicate the material, the equipment required, installation certificate, engineering, project management and start-up.

a.- Sign measures on different points of interest


  ANALOGUE DIGITAL
C.UHF FREQ. EMITER NAME P.V. P.S. QUALITY  POT. B.E.R. M.E.R.
66 830 MULTIPLEX 66(*)       54,5 4E-07 22,3
67 838 MULTIPLEX 67(*)       54,5 1E-06 22,0
68 846 MULTIPLEX 68(*)       47,5 8E-06 21,1
69 854 MULTIPLEX 69(**)       47,5 3E-05 20,4

 


  • ©2006-2012 | 
  • Lafcarr, Carrer Antoni Roviria i Virgili 2-4, 17180 Vilablareix, Tel. 972 406 075 - Fax. 972 396 471 · info@lafcarr.com