Instrumentation and detection
Field sensors to measure level, pressure and flow. Connected by redundant telemetry and ready for sites with no existing infrastructure.
View sensors and peripherals →
Continuous monitoring, early warning and engineering services for irrigation and storage ponds and auxiliary infrastructure.
Lafcarr covers a pond's full life cycle: from field instrumentation to technical management and operational maintenance. Each pillar works on its own or integrated, depending on criticality and available resources.
Field sensors to measure level, pressure and flow. Connected by redundant telemetry and ready for sites with no existing infrastructure.
View sensors and peripherals →24/7 monitoring platform with automatic threshold alerts, history, reports and remote management. All data in one web environment accessible from any device.
View iDam →Electronic sirens, manual and automatic activators, and warning protocols for operators and the public. Documentation and regulatory compliance included.
View warning systems →Operation management, safety reviews, preventive and corrective maintenance, and turnkey installation. Ongoing technical support tailored to each infrastructure.
View services →The solution is sized according to the pond's location, the available power, local communications, the level of monitoring required and the flood risk level (if any). The result can range from a standalone warning set-up to a connected architecture with sensors, telemetry and iDam.
Measurement of level, pressure, flow or weather variables, depending on the infrastructure's needs.
Event logging, remote communication and integration with a control centre or with iDam for visualisation, history and reports.
Functional validation, staff training and preventive or corrective maintenance to ensure operational continuity.
Manual activation in the field, an autonomous local controller or programmable logic with automatic triggering under defined conditions.
Compact or omnidirectional electronic siren, warning lights or both, depending on coverage and the operating environment.
An irrigation or storage pond does not usually need the same approach as a large dam, but a breach, overflow or operational failure can cause material damage, service interruptions and risks for operators or nearby areas.
The applicable regulatory obligation depends on the pond's classification, ownership, region and country; we recommend a specific applicability analysis in each case. Whether or not there is a specific obligation, a properly sized warning system clearly improves operational safety, shortens response times and provides traceability of what happened, making it possible to detect anomalies, warn in time and act with greater control.
Technical diagram of the integrated surveillance, sensor and remote control system for water storage infrastructure.
Many ponds are in rural areas with limited access, no continuous power supply or no existing control systems. That's why every Lafcarr solution is designed to work in real conditions, with rugged equipment, clear procedures and maintenance that doesn't require complex technical infrastructure.
Every pond has different access, power, communications and criticality conditions. Lafcarr adapts the architecture of each solution to these constraints, without oversizing or adding unnecessary complexity.
We answer the questions most often raised by operators, engineering firms and authorities during the consultancy phase.
No. Level 1 and level 2 solutions can run completely standalone or with local activation. A control centre is only needed when centralised remote monitoring is required, as in level 3 configurations with the iDam platform.
Yes. Where there is no power supply, configurations include solar power with backup batteries, sized to guarantee continuous operation even during periods of low sunlight.
Yes, provided the project architecture allows it and the existing sensors' signals are compatible. The technical feasibility of integrating third-party instrumentation is analysed during the engineering phase.
It depends on the configuration. In general, pond solutions are designed for low maintenance: periodic functional validation, battery checks (where applicable) and checking the status of sensors and communications. Lafcarr offers preventive and corrective maintenance services.
A standalone level 1 solution can be operational within a few days of project approval. Connected or end-to-end configurations require a prior engineering phase, but field deployment is usually completed quickly thanks to pre-configured kits.
Every situation needs a system tailored to the
risk, the environment and the regulations. Tell us about your
case: we'll design a functional,
scalable solution that meets the regulatory requirements identified for your project.