Emergency plan implementation for La Grajera Dam

A comprehensive emergency plan has been developed with preventive measures to mitigate the consequences of potential floods and ruptures.

For La Grajera Dam, a comprehensive emergency plan has been developed with preventive measures to mitigate the consequences of potential floods and ruptures, prioritizing the safety of both the dam and the surrounding population.

As part of these preventive actions, Lafcarr Project & Design has implemented an advanced monitoring and data acquisition system, covering parameters such as flow rates and levels.

Additionally, an emergency room has been established at the dam, along with a control center at the town hall and a population alert system through electronic sirens.

PROJECTS:
La Grajera
SECTOR:
Floods Risk
LOCATION:
La Grajera dam, Logroño
DATE:
2021
CLIENT:
Logroño City Hall